PROJECT 03
Pipeline Project – Gharraf Oil Field
Project Overview
Scope, location and technical context
Grand Line supported pipeline construction at Gharraf Oil Field, covering civil opening works, pipe handling, welding support, inspection coordination, testing support and reinstatement.
Location
Nasiriyah
Sector
Pipeline / Oil & Gas
Project
03
Engineering
Alignment with pipeline isometric and alignment-sheet requirements, weld maps, NDT hold points and hydrotest planning.
Construction
Excavation, trenching, pipe handling, welding support, tie-ins, backfilling and restoration along the right of way.
Testing
NDT coordination, coating inspection and hydrotesting support to confirm weld integrity and pipeline readiness.
Commissioning
Tie-in close-out and restoration works to return the corridor to the specified condition after construction.
Visual record