PROJECT 06
Fire & Alarm Systems – Seven Well Pads
Project Overview
Scope, location and technical context
Installation, wiring, verification and commissioning of fire detection and alarm systems across seven well pads at Majnoon Oil Field.
Location
Majnoon Oil Field
Sector
Oil & Gas / Fire & Safety
Project
06
Engineering
Cause & effect review, device addressing and panel logic verification against the fire and gas philosophy.
Construction
Field device installation, manual call points, detectors, alarm panels and field wiring across the well pads.
Testing
Device function tests, cause & effect verification and end-to-end alarm path checking.
Commissioning
Functional testing and commissioning of the fire and alarm systems for operational readiness.
Visual record